SG3 has served as the Utility Coordination Lead for the Elliott Bay Seawall Project since 2012. Below is a "travelogue" of project developments and milestones as they occurred, in real time.

__________________________________

FALL 2013

If You Like Slider Puzzles

You’ll Love This!

 

__________________________________

WINTER 2013/14

Everybody loves a good mystery.

Really?

Pumpkin Pi(pe) for New Years?

A Different Kind Of Seattle Boat Tour

Heading off construction delay

with a kayak.

__________________________________

SPRING 2014

Easy access to historical records

keeps construction moving

__________________________________

FALL 2014

The Start Of Season 2 Construction

on The Elliott Bay Seawall Project

Installing Wall Panels at

the Elliott Bay Seawall Replacement

– Season 2

__________________________________

WINTER 2014/15

A New Year – Demolition At Seattle’s

Historic Central Seawall

Mass Excavation and CIP Slab

Construction at the

Elliott Bay Seawall Project

Early February 2015 at the

Elliott Bay Seawall Project

Preparation for Habitat Bench and

Wall Panel Installation at Seattle’s

Seawall Replacement

New Seawall Panel Installation Near

Seattle’s Waterfront Park

__________________________________

SPRING 2015

The Seattle Seawall and Salmon

Migration Routes

New Seawall Structure Takes Shape

Along Seattle’s Waterfront Park

Light Penetrating Sidewalk At the

Seattle Seawall

Closing The Seattle Seawall

Superstructure at Waterfront Park

Shelving for the Seattle Seawall

Habitat Zone

__________________________________

SUMMER 2015

Final Touches For Seattle Seawall

Construction at Waterfront Park

Summer 2015 Arrives At

Seattle’s Seawall Project

Seattle’s Historic Piers Reopen

For Summer 2015

__________________________________

SPRING 2017

ESSP Update

CONTACT

info@SG3Strategies.com

425-285-4488

Copyright© 2017 SG3 Strategies, LLC

Website Design: Dolejsi Design