As Utility Coordination Lead, SG3 developed the plan to integrate new 26 kV power supply duct bank through six blocks of Seattle waterfront after the Waterfront Seattle design reached 100%. Coordinated system requirements between Seattle City Light, SDOT and Washington State Ferries to fast-track the design without changing other Waterfront project design elements. Washington State Ferries later revised their concept to install a submarine power cable, leaving a single block of this 26 kV power within the Waterfront project.